WET ROOM INSTALLATION MANCHESTER
This is Kerry and Matt’s wet room we completed in Manchester
When we started the room was already ripped out with everything removed, so we started by moving the new water pipes and waste pipes to the new required positions as the previous lay out of the bathroom had the toilet and the basin the other way round to as they are now in the pictures.
Then sure the floor out for the wet room former tray and plaster board all the walls, now we could start tiling the walls and floor. once the tiling was completed and grouted we could fit the satellite shower, shower enclosure, semi recessed basin unit, back to wall toilet, cupboard, work top and wall cupboard with mirror.
When we started the room was already ripped out with everything removed, so we started by moving the new water pipes and waste pipes to the new required positions as the previous lay out of the bathroom had the toilet and the basin the other way round to as they are now in the pictures.
Then sure the floor out for the wet room former tray and plaster board all the walls, now we could start tiling the walls and floor. once the tiling was completed and grouted we could fit the satellite shower, shower enclosure, semi recessed basin unit, back to wall toilet, cupboard, work top and wall cupboard with mirror.
Locations |
©
NEPTUNE BATHROOMS MANCHESTER - BATHROOM FITTERS MANCHESTER - ALL RIGHTS RESERVED 2016